House plans for WA.

Every plan under $1,000.

324+ construction-ready Australian home designs, delivered to your inbox the moment you buy. Below: exactly what WA requires to turn a plan into an approved build.

Approval needed
Building Permit (BA1 certified, or BA2 uncertified)
Issued by
your local government as permit authority
Energy compliance
NatHERS assessment demonstrating compliance with NCC energy provisions.

From plan to permit in WA

Buying a plan is the first step, not the last. Here is the sequence most Western Australia projects follow.

  1. 1Buy your plan and download the full set
  2. 2Engage a local designer to adapt the plan to your lot and local planning scheme
  3. 3Obtain structural engineering, a soil report and a NatHERS assessment
  4. 4Choose your pathway: BA1 requires a Certificate of Design Compliance from a registered building surveyor before lodgement; BA2 is lodged directly with the permit authority
  5. 5Lodge with your local government

What catches people out in WA

BA2 (uncertified) is only available for Class 1a and Class 10 buildings, meaning houses and structures like garages and sheds.

Timeframes differ: a certified BA1 is generally decided in 10 business days, an uncertified BA2 in 25.

Planning approval may be required separately before the building permit.

This is general guidance, not legal or building advice. Requirements change and vary by council, so always confirm with your local government as permit authority before you lodge.